Hazelwood School District, St. Louis, MO
Service: Ground Improvement (Vibro Stone Columns)
Subsurface was given the task of bringing weak clays and silts of strengths of 1,500 psf to a post-bearing pressure of 5,000 psf. Performance specifications called for less than one inch of settlement and less than one-half inch differential settlement.

Subsurface Constructors designed a system of 800 vibro stone columns installed with their stratacaster vibro rig. The 800 stone columns were installed in 20 days. Load testing of several production columns was performed in order to verify design column stiffness.
download the PDF
Image: Hazelwood School District project Click image to enlarge
Project at a Glance
  • Owner: Hazelwood School District
  • General Contractor: SM Wilson
  • Architect: TRI Architects
  • Structural Engineer: KPFF
  • Geotechnical Engineer: Midwest Engineering Services
  • Concrete Contractor: Demien
  • Equipment: Pennine Stratacaster