When Peabody Energy needed to bring transfomers to the Prairie State Energy Campus construction site, they faced a major obstacle. The transformers would have to cross over the Lenzburg Road East Bridge, but the bridge couldn’t sustain the 1 million pound loads that would be applied during these special heavy load transports.

To solve this problem, Subsurface Constructors designed and installed 30 micropiles as part of the county bridge retrofit. The micropiles ranged in capacity from 35 tons to 60 tons with required rock embedments of 2 ft. and 7 ft., respectively. Due to restricted access and extremely sloppy conditions, Subsurface used a low-overhead Klemm rig to install the pile. Load tests were successfully performed on each pile type.

Project details:

Owner: Edwards Moving & Rigging
Geotechnical Engineer: Kaskaskia Engineering Group
General Contractor: Keeley & Sons
Structural Engineer: Kaskaskia Engineering Group
Services Provided: Deep Foundation, Micropile
Year: 2010
Location: Lenzburg, Illinois

Get a Complete Analysis of Aggregate Pier Applicability to your Ground Improvement Project

Contact Subsurface Constructors today for a prompt and thorough analysis with experienced aggregate pier engineers, and get your project on the fast-track to completion.